Warren County Building & Zoning Header

Solar & Wind Power Information Frequently Asked Questions

Is a permit required for installation of solar panels, collectors and/or wind turbines?

Yes. A building and electrical permit is required. Call your local zoning department to inquire if a zoning permit is required.

Is an Engineer’s seal required on all plans?

Yes.

What type of inspections is performed?

For pole mounted solar panels or wind turbines a footer inspection is done. An electrical trench and service release may be required along with a final building and electric. This depends on the type and how extensive the work being performed is.

How much notice is required for an inspection?

24 hours

Can I get a time for an inspection?

Yes. Please call between the hours of 7am to 8am the day of the inspection.